home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V11_3 / V11_397.TXT < prev    next >
Internet Message Format  |  1991-07-08  |  15KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/caHt=:G00VcJ8Ofk4N>;
  5.           Tue, 15 May 90 01:25:31 -0400 (EDT)
  6. Message-ID: <4aHt-c-00VcJQOe04R@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Tue, 15 May 90 01:24:57 -0400 (EDT)
  11. Subject: SPACE Digest V11 #397
  12.  
  13. SPACE Digest                                     Volume 11 : Issue 397
  14.  
  15. Today's Topics:
  16.               Re:  SPACE Digest V11 #391
  17.               Re: The Vatican Connection
  18.            Payload Status for 05/09/90 (Forwarded)
  19.          NASA Headline News for 05/09/90 (Forwarded)
  20.            Payload Status for 05/14/90 (Forwarded)
  21.                Re: why there are no ETs
  22. ----------------------------------------------------------------------
  23.  
  24. From: AZM@CU.NIH.GOV
  25. Date:     Mon, 14 May 90  10:07:10 EDT
  26. Subject:  Re:  SPACE Digest V11 #391
  27.  
  28. > Date: 12 May 90 00:45:32 GMT
  29. > From: hao.hao.ucar.edu!dlb@handies.ucar.edu  (Derek Buzasi)
  30. > Subject: Re: The Vatican Connection
  31. >
  32. >
  33. > In article <memo.353588@lynx.northeastern.edu>
  34. > davidbrierley@lynx.northeastern.edu writes:
  35. >
  36. >
  37. > #     Last night (5-10-90) on _Prime Time Live_ there was a story on the
  38. > #observatory complex that the University of Arizona is planning to build.
  39. > #Some biologists have said that the project would harm the rare red squirrel
  40. > #that live there.  The project was temporarily delayed when the Fish and
  41. > #Wildlife Service placed the squirrel on the endangered species list.  The
  42. > #university pressured the Arizona delegation to Congress and a variance was
  43. > #granted.  As soon as the university began building an environmental group
  44. > #(I believe it was the Audubon Society) successfully filed suit and halted
  45. > #the project, at least for now.  The suit revealed that some biologists were
  46. > #pressured into telling Congress that the squirrels would not be in danger.
  47. > #
  48. > #      The university was able to pressure Congress because of the backers of
  49. > #the project were quite powerful: the Max Planck Institute, the Smithsonian,
  50. > #and even the Vatican!  Pope John Paul II even met with university officials
  51. > #in 1987 to discuss the project.  (And by backing I mean funding.)
  52. > #
  53. > #     This seems to show a marked change in the Church's attitude toward as
  54. > #astronomy.  Centuries ago it persecuted Galileo and only made its formal
  55. > #apology for doing so just a few years ago.  Know the Church is funding
  56. > #telescopes!  In my opinion, it would suggest that the Church feels that
  57. > #astronomy is a way towards understanding God better.  Any comments?
  58. >
  59. > The Vatican has a vested interest in the Mt. Graham site since, I believe,
  60. > that is where they are going to place the VATT (Vatican Advanced Technology
  61. > Telescope), a 1.8 meter instrument.
  62. >
  63. As for the animal rights activists seeking to protect the rare red
  64. squirrel, let those people offer up there homes as breeding areas
  65. for the rodents, and let's get on with science.
  66.  
  67. The Roman Catholic Church, headed up by Pope John Paul II, is the
  68. largest money-making, profit-making BUSINESS ORGANIZATION on Earth,
  69. and acts only, repeat ONLY, out of vested self-interest.
  70.  
  71. Any thought that they might be seeking to expand the world's know-
  72. ledge about anything is tantamount to insanity. With the current
  73. expansion of humanity's abilities in the area of astronomy, and the
  74. truths that MAY be revealed regarding the universe, and possible
  75. life in it, the Vatican MUST acquire that knowledge firsthand, in
  76. order to combat it with erudite-sounding church dogma, and thus
  77. perpetuate the mass ignorance of the world's masses, the church's
  78. mission since its inception.
  79.  
  80. To my mind, there is nothing more terrifying than that the Roman
  81. Catholic Church will, through the power of its incalculable wealth,
  82. control even the smallest part of what an instrument of scientific
  83. research will be used for. I will join any organization, and con-
  84. tribute time, money, and talent to it, that seeks to prevent the
  85. intrusion of the Roman Catholic Church into any scientific project.
  86.  
  87.                                          Derd Valpar
  88.                                   aka    Marlen
  89.                                          AZM@NIHCU
  90.  
  91. ------------------------------
  92.  
  93. Date: 14 May 90 05:58:32 GMT
  94. From: bfmny0!tneff@uunet.uu.net  (Tom Neff)
  95. Subject: Re: The Vatican Connection
  96.  
  97. In article <7312@ncar.ucar.edu> dlb@hao.hao.ucar.edu (Derek Buzasi) writes:
  98. >The Vatican has a vested interest in the Mt. Graham site since, I believe,
  99. >that is where they are going to place the VATT (Vatican Advanced Technology
  100. >Telescope), a 1.8 meter instrument.
  101.  
  102. What are they planning to do -- identify star formation regions and
  103. preach to them about the evils of stellar birth control?  Compile the
  104. Baltimore Cosmology?  ("78.  How do we obtain galactic equilibrium?  --
  105. Through penance and the intercession of the Virgin."  "132.  From whence
  106. comes the invisible dark matter in the universe? -- From the souls of
  107. Communist astronomers.")  Will all scientific results obtained by the
  108. VATT fall under the rubric of papal infallibility?
  109.  
  110. Just asking.  (ecumenical apologies and a tip o' the mitre to our
  111. Roman brethren) :-) :-) :-)
  112.  
  113. ------------------------------
  114.  
  115. Date: 14 May 90 17:30:55 GMT
  116. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  117. Subject: Payload Status for 05/09/90 (Forwarded)
  118.  
  119.  
  120.     Daily Status/KSC Payload Management and Operations 05-09-90.
  121.     
  122.     - STS-31R HST (at VPF) -
  123.     
  124.     Post launch GSE removal continues.
  125.     
  126.     
  127.     - STS-35 ASTRO-1/BBXRT (at Pad-A) -
  128.     
  129.     HUT batery pack charging and BBXRT battery removal/pump
  130.     power connections were performed Tuesday.  No payload
  131.     activities are scheduled for today.
  132.     
  133.     
  134.     - STS-40 SLS-1 (at 0&C) -
  135.     
  136.     Experiment train interface testing and ECS systems checks
  137.     are continuing along with MVAK training.
  138.     
  139.     
  140.     - STS-41 Ulysses (at ESA 60) -
  141.     
  142.     PAM-S spin balance operations will continue today at ESA 60.
  143.     VPHD preps will also continue today at the VPF.
  144.     
  145.     
  146.     - STS-42 IML-1 (at O&C) -
  147.     
  148.     Module pyrell foam replacement, floor staging, and rack
  149.     staging continue today.
  150.     
  151.     
  152.     - STS-45 Atlas-1 (at O&C) -
  153.     
  154.     Cable panel installations will be performed today.
  155.     
  156.     
  157.     - STS-46 TSS-1 (at O&C) -
  158.     
  159.     No work is scheduled for today.
  160.     
  161.     
  162.     - STS-47 Spacelab-J (at O&C) -
  163.     
  164.     No work is scheduled for today.
  165.     
  166.     - STS-55 SL-D2 (at O&C) -
  167.     
  168.     No work is scheduled for today.
  169.     
  170.     
  171.     - HST M&R (at O&C) -
  172.     
  173.     ORUC interface testing continues today.
  174.  
  175. ------------------------------
  176.  
  177. Date: 14 May 90 17:22:47 GMT
  178. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  179. Subject: NASA Headline News for 05/09/90 (Forwarded)
  180.  
  181. -----------------------------------------------------------------
  182. Wednesday, May 9, 1990               Audio Service: 202/755-1788
  183. -----------------------------------------------------------------
  184.  
  185. This is NASA Headline News for Wednesday, May 9...
  186.  
  187.  
  188. A valve change in a Freon cooling loop located beneath the 
  189. forward portion of orbiter Columbia payload bay may be required 
  190. prior to launch.  STS-35 mission managers will discuss a possible 
  191. launch date change now scheduled for May 17 at the Flight 
  192. Readiness Review scheduled today.
  193.                             ********
  194. The German ROSAT Satellite is on schedule for launch atop a U.S. 
  195. Delta 2 rocket at Kennedy Space Center on May 31. It kicks off a 
  196. 1 and 1/2-year program conducting the first survey of deep space 
  197. X-Ray sources.  One thousand times more sensitive than any 
  198. similar space-launched instrument, scientists expect examining 
  199. the wavelengths created from the birth and death of stars will 
  200. provide a new study of X-ray astronomy.
  201.                             ********
  202. To express his continued support of NASA's space program, 
  203. President Bush will meet with the space shuttle Atlantis crew at 
  204. the White House today.  
  205.                             ********
  206. Space Fax Daily says a press conference involving Glavkosmos and 
  207. NASA which concerns "a major international, record-breaking 
  208. adventure of scientific and environmental interest" is scheduled 
  209. this morning at the National Press Club in Washington, D.C.  It 
  210. is reported official statements are expected.
  211.                             ********
  212. Tomorrow, a Senate panel will review the NASA FY91 budget for 
  213. space science and applications programs.  The agenda will cover 
  214. Mars Observer, the Earth Observing System, Spacelab and the 
  215. Advanced Communications Technology Satellite Program.
  216.                             ********
  217. The mock emergency space shuttle launch, engine failure and crash 
  218. landing to test communications and disaster planning yesterday at 
  219. Kennedy Space Center went well.  It was the first of three 
  220. simulations planned before the end of the summer.
  221.                             ********
  222. Administrator Richard H. Truly will address agency employees on 
  223. NASA Select TV tomorrow, May 10 at 12:30 P.M.  His remarks will 
  224. come from Kennedy Space Center.  Many NASA centers will tape 
  225. record Truly's remarks for replay at selected times.
  226.                             ********
  227.  
  228.  
  229.  
  230.  
  231.  
  232.  
  233.  
  234.  
  235.  
  236.  
  237.  
  238.  
  239. ----------------------------------------------------------------
  240. Here's the broadcast schedule for Public Affairs events on NASA 
  241. Select TV.  All times are Eastern.
  242.  
  243.  
  244. Thursday, May 10....
  245.  
  246.                    11:30 A.M.     NASA Update will be
  247.                                   transmitted.
  248.  
  249. Friday, May 11......
  250.  
  251.                    11:00 A.M.     Dr. Clifford Stoll, author of
  252.                                   "The Cuckoo's Egg" will lecture
  253.                                   on computer security.
  254.  
  255. Monday-Wednesday, May 14-16...
  256.  
  257.                    9-11:00 A.M.   STS-35 Pre-Launch Briefing.
  258.  
  259.  
  260. All events and times are subject to change without notice.
  261. -----------------------------------------------------------------
  262. NASA Select TV: Satcom F2R, Transponder 13, 72 Degrees West 
  263. Longitude, Audio 6.8, Frequency 3960 MHz.
  264. -----------------------------------------------------------------
  265. These reports are filed daily, Monday through Friday, at 12:00 
  266. Noon, EDT.  This is a service of the Internal Communications 
  267. Branch, NASA Headquarters.
  268.  
  269. ------------------------------
  270.  
  271. Date: 14 May 90 17:34:39 GMT
  272. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  273. Subject: Payload Status for 05/14/90 (Forwarded)
  274.  
  275.  
  276.     Daily Status/KSC Payload Management and Operations 05-14-90.
  277.     
  278.     - STS-31R HST (at VPF) -
  279.     
  280.     Post launch GSE removal continues.
  281.     
  282.     
  283.     - STS-35 ASTRO-1/BBXRT (at Pad-A) -
  284.     
  285.     No payload activities are scheduled for today.
  286.     
  287.     
  288.     - STS-40 SLS-1 (at 0&C) -
  289.     
  290.     The mission sequence test will start today and MVAK training
  291.     will continue.
  292.     
  293.     
  294.     - STS-41 Ulysses (at ESA 60) -
  295.     
  296.     PAM-S spin balance operations will continue today at ESA 60.
  297.     VPHD preps will continue today at the VPF.
  298.     
  299.     
  300.     - STS-42 IML-1 (at O&C) -
  301.     
  302.     Module pyrell foam replacement, floor staging, and rack
  303.     staging continue today.
  304.     
  305.     
  306.     - STS-45 Atlas-1 (at O&C) -
  307.     
  308.     Cable and cable panel installations will continue today.
  309.     
  310.     
  311.     - STS-46 TSS-1 (at O&C) -
  312.     
  313.     HDRR cables will be removed third shift Tuesday.
  314.     
  315.     
  316.     - STS-47 Spacelab-J (at O&C) -
  317.     
  318.     No work is scheduled for today.
  319.     
  320.     
  321.     - STS-55 SL-D2 (at O&C) -
  322.     
  323.     No work is scheduled for today.
  324.     
  325.     
  326.     - HST M&R (at O&C) -
  327.     
  328.     Paper closure will be performed today.
  329.  
  330. ------------------------------
  331.  
  332. Date: 13 May 90 01:58:17 GMT
  333. From: clyde.concordia.ca!mcgill-vision!quiche!calvin!msdos@uunet.uu.net  (Mark SOKOLOWSKI)
  334. Subject: Re: why there are no ETs
  335.  
  336. Newsgroups: sci.space
  337. Subject: Re: Venus and Mars and Asteroids O MY!
  338. Summary: 
  339. References: <DLBRES10.90May10144033@pc.usl.edu>
  340. Sender: 
  341. Reply-To: msdos@calvin.cs.mcgill.ca (Mark SOKOLOWSKI)
  342. Followup-To: 
  343. Distribution: sci.space
  344. Organization: SOCS, McGill University, Montreal, Canada
  345. Keywords: 
  346.  
  347. In article <DLBRES10.90May10144033@pc.usl.edu> dlbres10@pc.usl.edu (Fraering Philip) writes:
  348. >This posting will, like the previous one, cover several topics:
  349. >
  350. >Mark S. was talking about the space shuttle system, and why the liquid
  351. >hydrogen motors were both extremely complex and unsafe. I would like to
  352. >state that although the turbines on the SSME are very complex, they are not
  353. >much more complex than the most advanced jet engines in use today. The
  354. >
  355. False, the turbines are subjected to far greater constraints and pressure
  356. (200 athmospheres) than in any rocket engine ever! Just look at a photo,
  357. and try to figure out were the input/output of hydrogen are!!! (Beside,
  358. there are 2 stages of turbopumps, and all has to weight no more than
  359. 100 kg!!!).
  360. >
  361. >2. About a Venus Base being a pleasant place to live:
  362. >
  363. I'm convinced that batyscaphs are not needed, since the right athmosphere
  364. of hydrox can nullify the risks of pressurization. And look at any
  365. kitchen oven: There is a (big big big) window, since glass blocks infrared,
  366. and the insulation is of not more than 1 or 2 cm wide, and you can touch the
  367. oudside with your finger. And for those guys that tell me that a high-tech
  368. sophisticated fancy window structure is needed, I'll simply point out
  369. that the so-called diamond mirrors in the pionneer probes were only made of
  370. diamond because this later cristal doesn't block infrared, which was an
  371. obvious property needed for a pyrometer and a spectrograph stuck to it.
  372. >
  373. >3. About space colonies and industrialization:
  374. >
  375. Venus has more surface area than all the solid bodies of the solar system
  376. combined! (And I'm correcting a statement I made in a previous posting
  377. in which I said Venus had more solid surface area than all the INNER
  378. solar system bodies... This time I can confidently include all the moons
  379. of Jupiter, Saturn, Uranus, Neptune, and Pluto, Charon, the ateroids).
  380. >
  381. >provide us with metals without destroying biosphere. It would be exporting
  382. >our problems, but wouldn't it be prudent to export them to somewhere where
  383. >there is _no_ life whatsoever?
  384. >
  385. That's pure imperialism. The same argument was used by conquistadors when
  386. they were exterminating the aztecs. Look at what is happening with 
  387. Antarctica!!! Messing up the Earth, and then going out to mess up the rest 
  388. of the universe is not precisely my idea of space exploration... 
  389.  
  390. Mark S.
  391. -------
  392.  
  393. ------------------------------
  394.  
  395. End of SPACE Digest V11 #397
  396. *******************
  397.